Project leader: Christian Stolle, B.A

Job title: forwarding merchant
Current position: employee in the production planning department





Selection and introduction of an operating data logging system

Task:

Increasing competition, rising customer expectations as well as the trend for small lot size production requires to react quickly to new conditions on the market and forces a company to be highly flexible. As a result existing business processes of the production planning have to be optimised.

Methods:

  • Analysis of the current situation
  • Creation of a Concept
  • Creation a performance specification
  • Research of the market
  • Evaluation of benefit / effort
  • Introduction


Results:

Selection and introduction of an adequate operating data logging system together with an electronic production control station.

Benefits:

Generating a simplified operative production planning and targeted information transfer as well as a transparent illustration of the production processes. At the same time very stringent quality control requirements are met.

Last update 08. June, 2010